READY for SAILOUT
#BorWin gamma transportation #Dubai #North Sea: READY FOR SAILOUT! Now the topside is in front of...
Read MorePosted by admin | Sep 10, 2018 | BOR3 TRANSPORT
#BorWin gamma transportation #Dubai #North Sea: READY FOR SAILOUT! Now the topside is in front of...
Read MorePosted by admin | Sep 9, 2018 | BOR3 TRANSPORT
Borwin3 Transportation Dubai-Northsea: After 6 flying hours and over 5000 km from Hamburg to Dubai...
Read MorePosted by admin | Sep 8, 2018 | BOR3 TRANSPORT
Borwin3 Transportation Dubai-Northsea: Today it is time to pack the suitcase. I would like to...
Read MorePosted by admin | Aug 22, 2018 | BOR3 TRANSPORT
From Dubai (A 10.09.) We will pass Yemen into the Red Sea (C 16.09.), Through the Suez Canal (D...
Read MoreHere, in September 2018, I will report for more than 3 weeks about the transport of the converter platform BorWin gamma (part of the grid connection project BorWin3) from Dubai to the North Sea.
BorWin3 is a grid connection project realized by TenneT off the coast of Borkum in DC technology. BorWin gamma offshore platform was built by DryDocks World in Dubai consortium of Siemens and Petrofac.
The 71x71x30 meter platform weighs over 18,000 tons and is transported by the XIANG HE KOU Heavy Load Carrier (IMO: 9752656, MMSI: 477810700).
Every day I’m on tour I post in a 1-minute video the most interesting topic about the transport including the day picture. In addition, I show the positions of the transport ship and my position. I plan to shoot in Dubai, Suez Canal, Gibraltar and the North Sea.